Get Quotes
Repairs
Roof RepairsRoof Leak DetectionEmergency Roof RepairsTile Roof RepairsMetal Roof RepairsFlat Roof RepairsSlate Roof RepairsStorm Damage Roof Repairs
New Roofs
Roofing ContractorsRoof ReplacementRoof InstallationRoof Sheeting InstallationThatch Roof Conversion
Roof Care
Roof InspectionsRoof MaintenanceRoof CleaningRoof Painting
Cost Guides
Roof Repair CostRoof Replacement CostRoof Waterproofing CostRoof Painting CostRoof Installation CostGutter Installation Cost
Johannesburg
JohannesburgSowetoMelvilleNorthcliffHoughtonRosebankIllovoHyde Park
Sandton & North
SandtonBryanstonRivoniaMorningsideSunninghillWoodmeadFourways
Midrand
MidrandKyalami
Randburg & North West
RandburgFerndaleNorth RidingHoneydewWeltevredenpark
West Rand
RoodepoortKrugersdorp
East Rand
East RandKempton ParkBoksburgBenoniGermistonAlbertonEdenvaleBedfordviewSprings
Waterproofing
Roof WaterproofingTorch On WaterproofingFlat Roof WaterproofingBalcony Waterproofing
Gutters & Roof Edges
Gutter InstallationGutter RepairsGutter CleaningFascia Board ReplacementRoof Flashing RepairsRoof Valley Repairs
Property & Interior
Commercial RoofingIndustrial RoofingCeiling RepairsRoof Insulation
Company
AboutReviewsContact

Roof Replacement Cost in South Africa

Get the best quote
Leaderr approved Roof Replacement Cost in South Africa - aerial view of roofers at work on a dark tiled roof above a white Cape-style home with a pool

Roof Replacement Cost is mostly set by roof area, the new covering and the condition of the timber underneath. Here are typical per square metre rates and totals for re-roofing a South African home.

Get a price for your roof rather than a range. Send one request, with no obligation.

Get Roofing Quotes

Re-Roofing Prices per m²

Ballpark prices so you can sanity-check a quotation.

ItemBallpark price
Strip and dispose of old covering (non-asbestos)R50 - R120 per m²
IBR or corrugated sheeting, supplied and fixedR450 - R800 per m²
Klip-Lok or concealed-fix sheetingR600 - R1,000 per m²
Concrete tiles with battens and underlayR550 - R900 per m²
Clay tiles with battens and underlayR700 - R1,200 per m²
Replacing roof trusses, where neededR350 - R900 per m² extra
Asbestos removal by a registered contractorR180 - R520 per m² extra
Typical 150 m² single-storey roofR85,000 - R180,000

Prices JUST UPDATED. Indicative ballpark figures in rand, rounded, based on typical South African market rates. They are not our prices or quotations, and no contractor is bound by them. Ask whether VAT is included, and check what each quotation covers, such as scaffolding, rubble removal and call-out fees.

Worked Example

A 140 m² concrete tile roof with sound trusses: stripping R8,400 - R14,000, new tiles, battens and underlay R84,000 - R119,000, fascia and gutters R5,000 - R12,000. Total roughly R97,000 - R145,000. With IBR sheeting instead of tiles the main line drops to about R63,000 - R112,000.

What Affects the Price

  • Roof area and pitch. Bigger and steeper roofs need more material, labour and safety equipment.
  • Covering. IBR is usually cheapest, clay tiles the most expensive.
  • Timber condition. Rotten battens, purlins or trusses add significantly.
  • Asbestos. Removal must be done by a registered contractor and costs extra.
  • Extras. Scaffolding R3,000 - R12,000, skip hire R2,500 - R5,000, new gutters and fascias.

What a Quotation Should Include

  • Area measured. Roof area in square metres, not floor area.
  • Covering specification. Tile or sheet type, profile, thickness and colour.
  • Underlay and insulation. Whether new underlay, battens or insulation are included.
  • Structural work. Truss inspection, replacements and sign-off.
  • Removal and clean-up. Stripping, disposal and site clean-up.
  • Warranty. Workmanship warranty in writing, plus the manufacturer warranty.

Compare written quotes for the same scope. Describe the job once and get the best quote, fast.

Get Roofing Quotes

Frequently Asked Questions

Is it cheaper to re-roof with IBR than tiles?

Usually yes. IBR is lighter and quicker to fix, though some estates and complexes require tiles.

Can I keep my existing trusses?

If they are sound and suitable for the new covering, yes. Changing from sheeting to heavier tiles may need the structure checked first.

Do I need plans to replace my roof?

Like-for-like re-covering often does not, but changing the structure or pitch usually does. Check with your municipality.

How long does a re-roof take?

A typical house takes from a few days to a couple of weeks, depending on size, weather and structural work.

Related Services

Get re-roofing prices from local contractors through Roof Repairs South Africa and compare them on the same specification.

Roof Repairs South Africa is a lead-generation and quote-comparison service. We do not carry out roofing work and we do not employ roofers. Work is quoted and carried out by independent contractors, and your agreement is with the one you choose. Get a written quotation, check insurance and workmanship warranties, and avoid paying the full amount upfront.

Get the Best Quote, Fast

Keep it brief. Say what needs doing, where the property is and how to reach you. Your enquiry is passed only to roofing contractors suited to the job, and you decide whether to go ahead.

Client Reviews

Powered by leaderr

GetQuotes